Meanwhile, in Indonesia, the Jakarta-Bandung high-speed train trial will be conducted during the G20 period, namely in November 2022.
This was stated by Deputy Minister (Wamen) of BUMN II Kartika Wirjoatmodjo.
“We will conduct a trial later in November 2022 during the G20 route from Tegalluar route to Kopo,” Kartika Wirjoatmodjo was quoted as saying Monday (9/12/2022).
He also mentioned that the arrival of this series of high-speed trains in Indonesia is a form of preparation before the G20 activities to be held next November. Indonesian President Joko Widodo and Chinese President Xi Jinping are expected to pay a working visit to see the progress of the work as well as try out the inspection train (EMU – CIT) of DK 127 at Tegalluar station.
“God willing, according to the calendar like that, but we will see at the time of the G20,” he said. Jakarta-Bandung High Speed Rail (KCJB) arrived at Tanjung Priok Port, Jakarta.
Currently, PT KCIC, together with a consortium of contractors, continues to accelerate various developments and prepare for requirements ahead of next year’s dynamic test and operation.
The G20 summit itself is a summit attended by all heads of government/member countries of the G20. G20 members are South Africa, United States, Saudi Arabia, Argentina, Australia, Brazil, India, Indonesia, United Kingdom, Italy, Japan, Germany, Canada, Mexico, Republic of Korea, Russia, France, China, Turkey and the European Union.
Here are the facts related to the Jakarta-Bandung High Speed Rail (KCJB) project:
“Tvaholic. Beer guru. Lifelong internet nerd. Infuriatingly humble pop culture scholar. Friendly food advocate. Freelance alcohol fan. Incurable bacon ninja.”